IADC DEC Tech Forum Minutes
“What Does ‘Prepared for MPD’ Mean?
Date: 19 September 2017
Time: 8 am – 12 pm
Venue: Weatherford
Location:
11909 Spencer Rd
Houston, TX 77041
Contact: Holly Shock
Phone: 1-713-292-1945
Email: holly.shock@iadc.org
The IADC DEC Technology Forum was called to order by Committee Chairman, Keith Lynch, ConocoPhillips & Dennis Moore, Marathon. Mr. Lynch & Mr. Moore thanked attendees for coming.
The following presentations were made:
Presentation | Speaker |
---|---|
MPD Application Process | Fred Brink, BSEE |
“Prepared for MPD” Managed Pressure Drilling Rig Capabilities | Wael Essam, BP |
MPD – a Rig “Prepared for MPD” | Roger van Noort, Shell |
What Does ‘Prepared for MPD’ mean? A Contractors perspective | John Kozicz, Transocean |
Equipped for MPD | Neal Richard, Weatherford |
Subsea Pump System – Optimized for Rapid Deployment & Operation within the Primary Barrier | Brian Piccolo, AFGlobal |
Mr. Lynch & Mr. Moore thanked Weatherford for hosting the forum.